Elgin, SC

Pontiac Elementary

Early Childhood School / Elementary School

Renovation/Addition

Classrooms, Library, Media Center, Outdoor Space

2025 Outstanding Project

Pontiac Elementary School is a testament to the power of a comprehensive design process that goes beyond the initial needs to positively impact the school culture. Goodwyn Mills Cawood worked closely with the school administration to find innovative solutions that exceeded expectations. By focusing on community, collaboration, and flexibility, the team transformed the school into a place where students can thrive.

Prior to the renovations and addition, the school was separated into two distinct programs, which were described by the teachers as being disconnected and at odds with each other, lacking a sense of wholeness. The result of the addition bridged the divide and created a strong sense of connection and community.

The new media center and related arts hub encourage interaction and collaboration among students from different learning styles by transforming the courtyard into outdoor play and learning areas that extend the classroom experience. The redesign of the Montessori classrooms created a more open and flexible learning environment.

The conversion of the former media center into a multi-purpose gym provided a larger, centrally located physical education space for all students. Exterior improvements, such as the extended car rider line and enhanced site circulation, improved accessibility, and safety.

Architect

Goodwyn Mills Cawood (GMC)

915 Lady St., Ste. C
Columbia, SC 29201
gmcnetwork.com
Justin Lucas, AIA, NCARB, Project Architect
803-766-1235

Design Team

  • Marc Warren, AIA, Principal, GMC
  • ADC Engineering, Structural Engineer
  • Buford Goff & Associates, Electrical Engineer

Owner/Client

Richland School District Two
Columbia, SC
John Clayton, Director of New Construction

Key Stats

  • Grades Served: PreK–5
  • Capacity of Students/Occupants: 700
  • Size of Site: 20 acres
  • Gross Area of Bldg./Space: 93,456 gsf
  • Space per Student: 133.5 sq. ft.
  • Cost per Student: $18,802
  • Square Foot Cost: $141
  • Project Cost: $13,162,000
  • Occupation Date: 7/1/2024

Award Issue

Spring 2025
— Outstanding Project

Photography

©2024 Kris Decker/Firewater Photography