Sandy, UT

Union Middle School

Middle School/Intermediate School

New Construction

Entire Building

2025 Outstanding Project

Union Middle School was in serious need of replacement. The decision was made to construct the replacement school on-site. Extensive consultations with District staff, school leaders, and stakeholders resulted in a community and student-focused approach. The team engaged students in the construction process, sharing drawings and models and taking classes on tours.

Site orientation was key to the design allowing the new facility to achieve optimal solar orientation for classroom wings while creating a prominent street presence. Construction materials balance durability, functionality, and aesthetic appeal. Interior spaces combine bold yet practical finishes, emphasizing school branding and wayfinding. Tilt-up concrete panels with textured form-liners provided a cost-effective yet visually striking structural solution.

Union Middle’s architecture revolves around eight distinct building blocks, each crafted to promote collaboration and well-being. The main entrance creates an iconic branded canopy and a high-volume interior welcome hall. The library above includes irresistible cantilevered reading nooks.

Other blocks include three grade-specific learning suites featuring flexible classrooms surrounding central collaboration spaces. The fourth house hosts special education spaces, CTE labs, and 2D/3D art studios with a unique student art gallery. The double-height commons/dining space fosters social connectivity with a learning stair and an expansive student courtyard.

Architect

VCBO Architecture

524 South 600 East
Salt Lake City, UT 84102
vcbo.com
Jeanne Jackson, FAIA, LEED AP, Principal
801-575-8800

Design Team

  • Jeanne Jackson, FAIA, LEED AP, Principal-in-Charge
  • Brian Peterson, Project Manager
  • Cassandra Tavolarella, Design Team
  • Wesley Aldrich, Design Team

Owner/Client

Canyons School District
Sandy, UT
Leon Wilcox, CPA, Business Administrator

Key Stats

  • Grades Served: 6–8
  • Capacity of Students/Occupants: 1,100
  • Size of Site: 24.9 acres
  • Gross Area of Bldg./Space: 215,560 gsf
  • Space per Student: 196 sq. ft.
  • Cost per Student: $55,782
  • Square Foot Cost: $285
  • Project Cost: $61,360,000
  • Occupation Date: 9/5/2023

Award Issue

Spring 2025
— Outstanding Project

Photography

©Jared Kenitzer