Coral Gables, FL

The Phillip & Patricia Frost Institute for Chemistry & Molecular Science

College/University

New Construction

Science Laboratories

2024 Outstanding Project

This post was originally published on this site.

The Institute aims to establish a cutting-edge research laboratory at the university’s core, utilizing recent advances in cryogenic transmission electron microscopy (cryo-EM). These advanced instruments offer near-atomic resolution, driving progress in biological, material, and chemical sciences. Workshops involving university donors, the facilities team, and researchers have set the following goals before design:

  • Develop a high-level chemistry and materials research lab with adaptable, modular benches connected to a ceiling grid for data, fluids, and gases.
  • Maximize natural, glare-free light in all areas except microscopy, with large windows offering park views.
  • Ensure security while promoting undergraduate and visitor engagement with interdisciplinary research, and accommodating ground-level campus traffic.Plan for clear wayfinding to encourage informal meetings among leaders, researchers, visitors, and graduate assistants.
  • Highlight the green campus setting, optimizing views from labs, write-up spaces, meeting rooms, and offices.
  • Ensure the new facility complements neighboring buildings and integrates with campus pedestrian traffic flow.

Architect

Harvard Jolly | PBK

2047 Vista Pkwy, Ste. 100
West Palm Beach, FL 33411
harvardjolly.com
Rene Tercilla, AIA, ALEP, Senior Managing Principal
561-478-4457

Design Team

  • Yann Weymouth, FAIA, Design Director, Special Projects – Harvard Jolly|PBK
  • Research Facilities Design, Laboratory Design Consultant
  • WSP Engineering, MEP/FP Engineering
  • Bliss & Nyitray, Structural Engineering

Owner/Client

University of Miami
Coral Gables, FL
Jessica Brumley, Vice President | Facilities Operations & Planning

Key Stats

  • Population Served: Post-Secondary
  • Capacity of Students/Occupants: 789
  • Size of Site: 1.75 acres
  • Gross Area of Bldg./Space: 89,799 gsf
  • Space per Student: 114 sq. ft.
  • Cost per Student: $86,915
  • Square Foot Cost: $764
  • Project Cost: $68,576,008
  • Occupation Date: 10/4/2022

Award Issue

Fall 2024
— Outstanding Project

Photography

©2023 Moris Moreno