Sharon, MA

Sharon High School

High School

New Construction

Entire Building

2024 Citation of Excellence - Over 100,000 sq ft

This post was originally published on this site.

Nestled in a picturesque New England town, Sharon High School embodies the district’s core values: acceptance, equity, integrity, respect, kindness, and teamwork. The design deliberately integrates these principles using vibrant graphics, colors, and layout to foster inspiration, connection, and a sense of belonging. Common areas like breakout spaces along the main corridors, the cafeteria, library, and academic support centers help cultivate community and social and emotional wellbeing by allowing students to collaborate and foster meaningful relationships.

Showcased physical education studios and gym, located centrally, infuse wellbeing into the school culture, making it a priority for students. The black box theater and cutting-edge auditorium underscore the school’s dedication to its distinguished performing arts program. Flexible spaces, including STEAM labs, breakout areas, small study rooms, makerspace, and SPED suites accommodate diverse educational needs. Embracing hands-on learning, the design encourages adaptability and future-focused education initiatives. Biophilic design elements like green roofs, outdoor patios, and expansive glass windows with lake views seamlessly merge the school with its natural surroundings, enriching the learning environment.

Architect

Tappe Architects

6 Edgerly Place
Boston, MA 02116
tappe.com
Charles Hay, AIA, Principal-in-Charge
617-451-0200

Design Team

  • Christopher Blessen, AIA, Managing Principal
  • Wendy Hynes, Director of Interior Design
  • Warner Larson, Landscape Architect

Owner/Client

Sharon Public Schools
Sharon, MA
Kristen Keenan, Principal

Key Stats

  • Grades Served: 9–12
  • Capacity of Students/Occupants: 1,250
  • Size of Site: 28.5 acres
  • Gross Area of Bldg./Space: 240,204 gsf
  • Space per Student: 192 sq. ft.
  • Cost per Student: $128,552
  • Square Foot Cost: $669
  • Project Cost: $160,691,000
  • Occupation Date: 8/25/2022
  • Sustainability Rating Status: LEED Silver Applied

Award Issue

Fall 2024
— Citation of Excellence

Photography

©Ed Wonsek ArtWorks

Related Projects

2026 Outstanding Project

Outstanding Project

Tisbury School

Tappe Architects
2025 Citation of Excellence Award

Citation of Excellence Award

Walpole Middle School

Tappé Architects