Vineyard Haven, MA

Tisbury School

Early Childhood School / Elementary School

Renovation/Addition

Entire Building

2026 Outstanding Project

The Tisbury School has anchored learning and community life since 1929, earning deep affection as a formative place for generations of Islanders. As its centennial approached, age and evolving educational needs made renewal essential. From the outset, the community emphasized that any changes must preserve the school’s character while preparing it for the future.

The design responds with a careful balance of restoration and expansion. The constrained site and desire to retain existing structures led to a unique solution that weaves old and new, improves access, and enhances circulation without disrupting the school’s familiar feel. A new bridge links the historic and contemporary wings.

Additions and upgrades introduce the elements expected of a 21st-century learning environment while maintaining an “old school” warmth through high, wood-finish windows. Media centers on each floor, a modern gym with performance stage, dedicated band room, and updated cafeteria expand opportunities for learning and enrichment. Custom environmental graphics root students in their layered context – from Town to Island to Commonwealth and beyond.

The renewed Tisbury School honors its past while offering a flexible, future-ready home for generations to come.

Architect

Tappe Architects

6 Edgerly Place
Boston, MA 02116
www.tappe.com
Christopher Blessen, AIA, Principal-in-Charge
617-451-0200

Design Team

  • Wendy Hynes, Director of Interiors
  • Warner Larson, Landscape Architect
  • W.T. Rich, Construction Manager
  • Engineers Design Group, Structural Engineer

Owner/Client

Martha’s Vineyard Public Schools
Vineyard Haven, MA
John Custer, Principal

Key Stats

  • Grades Served: K–8
  • Capacity of Students/Occupants: 350
  • Size of Site: 5.15 acres
  • Gross Area of Bldg./Space: 73,489 gsf
  • Space per Student: 210 sq. ft.
  • Cost per Student: $231,428
  • Square Foot Cost: $1,102
  • Project Cost: $70,000,000
  • Occupation Date: 8/9/2024

Award Issue

Spring 2026
— Outstanding Project

Photography

©Ed Wonsek ArtWorks

Related Projects

2025 Citation of Excellence Award

Citation of Excellence Award

Walpole Middle School

Tappé Architects
2024 Citation of Excellence Award

Citation of Excellence Award

Sharon High School

Tappe Architects