Dighton, MA

Center for Science and the Environment, Bristol County Agricultural High School

High School

New Construction

Science Center

2024 Grand Prize - Under 100,000 sq ft

Designed as a living learning center, Bristol County Agricultural High School’s new Center for Science and the Environment (CSE) supports science and environmental research with state-of-the-art labs and specialized academic spaces. Home to a student-curated natural resource museum, bio-secure labs, flexible classrooms, and a student-planted roof garden, the CSE accommodates Bristol Aggie’s highly technical programs with innovative technology, lighting and thermal control, and specialized equipment.

The CSE functions as a teaching tool with sustainable building systems and design elements that reduce energy use, carbon emissions, and water consumption; contribute to a healthy interior environment; and promote hands-on learning. The CSE is the first public school building in Massachusetts to have composting toilets, which help reduce annual water use by 68% from code and educate students about water conservation. Additional sustainable design elements include green roofs, photovoltaics, and rainwater collection and reuse systems.

Bold and educational wall graphics illustrate scientific concepts from Bristol Aggie’s curriculum and help cultivate a unique and memorable learning environment for students, teachers, and visitors.

Architect

HMFH Architects

130 Bishop Allen Dr.
Cambridge, MA 02139
hmfh.com
Liza Bouton, Marketing Manager
617-492-2200

Design Team

  • Laura Wernick, FAIA, LEED AP, Project Director
  • Bobby Williams, AIA, LEED AP, Project Manager
  • Suni Dillard, AIA, LEED AP BD+C, Project Architect

Owner/Client

Bristol County Agricultural High School
Dighton, MA
Derek Costa, Superintendent

Key Stats

  • Grades Served: 9–12
  • Capacity of Students/Occupants: 640
  • Size of Site: 220 acres
  • Gross Area of Bldg./Space: 73,500 gsf
  • Space per Student: 115 sq. ft.
  • Cost per Student: $60,781
  • Square Foot Cost: $529
  • Project Cost: $38,900,000
  • Occupation Date: 12/1/2021
  • Sustainability Rating Status: LEED Gold

Award Issue

Spring 2024
— Grand Prize

Photography

@Ed Wonsek Artworks

Related Projects

2026 Grand Prize

Grand Prize

Arlington High School

HMFH Architects
2025 Grand Prize

Grand Prize

Josiah Quincy Upper School

HMFH Architects