North Vancouver, BC

Handsworth Secondary School

High School

New Construction

Entire Building

2024 Citation of Excellence - Over 100,000 sq ft

KMBR has been on the forefront of education facility planning and design in BC for nearly 60 years and are leaders in the design of 21st Century learning environments, having planned or designed more than 200 K–12 facilities in 36 School Districts over the last 15 years alone.

This seismic replacement project in North Vancouver, British Columbia, offered an opportunity for the School District to create a school with a forward-looking education pedagogy based on inclusive and student-centric learning. The project goals aims to go beyond a typical 21st Century school, using a generative design process layering program, circulation, Indigenous ways of learning, and exterior connections to produce opportunities for interaction and inspiration.

The Student Commons, located at the heart of the school, is designed as a large three-story light-filled atrium. A multitude of learning spaces open directly onto the Commons creating a hub of student activity. By layering program, the vibrant multi-purpose space supports diverse activities, encourages social interactions, and fosters community.

Supporting the goals of fostering strong relationships, the classrooms, break-out rooms, collaborations spaces and teacher preparation rooms are organized into Small Learning Communities within the larger school. The learning communities facilitate interdisciplinary teaching, student-led learning, and help build relationships between students and teachers.

Architect

KMBR Architects Planners Inc.

300 – 152 West Hastings St.
Vancouver, BC V6B1G8
www.kmbr.com
Kate Lemon, Architect AIBC, Principal
604-732-3361

Design Team

  • KMBR Architects Planners Inc., Kate Lemon, Principal
  • Glotman Simpson Consulting Engineers, Levi Stoelting, Structural Engineer
  • Introba, Mladen Markovic, Mechanical Engineer
  • van der Zalm + Associates, David Jerke, Landscape Architect

Owner/Client

North Vancouver School District SD-44
North Vancouver, British Columbia
Mark Thomson, Capital Project Manager

Key Stats

  • Grades Served: 8–12
  • Capacity of Students/Occupants: 1,400 Students
  • Size of Site: 13.85 acres
  • Gross Area of Bldg./Space: 140,318 gsf
  • Space per Student: 100 sq. ft.
  • Cost per Student: $43,571 CAD
  • Square Foot Cost: $435 CAD
  • Project Cost: $61,000,000 CAD
  • Occupation Date: 2/4/2022

Award Issue

Spring 2024
— Citation of Excellence

Photography

@edwhitephotographics