• Acoustic Solution
  • Spring 2027 CFE

Austin, TX

Eastside Memorial Early College High School

High School

New Construction

Entire Building

2025 Outstanding Project

Through a strong vision of academic excellence, multiculturalism, and community connectivity, the new Eastside Early College High School is designed to honor the past, excel in the present, and positively impact the future. Key to this vision is the relocation of the school to the site of the Original L.C. Anderson High School, which had an 82-year history of serving the African American Community in East Austin with nationally known excellence in academics, fine arts, career preparation, and athletics.

In 1971, the Original Anderson High School was ordered to be closed by a federal court as part of desegregation, this shuttered the lifeblood of the community and scattered its students across the city. Sitting mostly vacant for decades, the school became structurally condemned, no longer symbolizing the hope of education. Instead, the campus came to represent the marginalization of the community.

The new school rebuilds the Original Anderson legacy through historic reconstruction, alumni gallery, and graphic history walls. Out of the foundation of the past, the new campus rises upward to uplift the students at Eastside Early College High School to attend classes on eye level of the central business district with college connections and improved career opportunities.

Architect

PERKINS&WILL

310 Comal St., Ste. 100
Austin, TX 78702
perkinswill.com
Travis Hughbanks, AIA, LEED, Associate Principal
512-640-8507

Design Team

  • PERKINS&WILL, Architects
  • Intelligent Engineering Services, Structural Engineer
  • Jose I. Guerra Inc., M/E/P
  • Coleman & Associates, Landscape Architects

Owner/Client

Austin Independent School District
Austin, TX
Matias Segura, Superintendent

Key Stats

  • Grades Served: 9–12
  • Capacity of Students/Occupants: 800
  • Size of Site: 17 acres
  • Gross Area of Bldg./Space: 173,000 gsf
  • Space per Student: 216 sq. ft.
  • Cost per Student: $85,000
  • Square Foot Cost: $393
  • Project Cost: $68,000,000
  • Occupation Date: 8/22/2022
  • Sustainability Rating Status: LEED Silver

Award Issue

Spring 2025

Outstanding Projects

Photography

©Piotr Mokry; ©Dror Baldinger

Related Projects

2024 Outstanding Projects

Outstanding Projects

Westview High School and YMCA

Perkins&Will with BCDM