Pawtucket, RI

Henry J Winters Elementary School

Early Childhood School / Elementary School

New Construction

Entire Building

2024 Citation of Excellence - Under 100,000 sq ft

Moseley Architects conducted an initial study to evaluate all options for the West Millbrook Middle School site, eventually determining that a same-site replacement would be the most effective solution. The original school remained occupied during construction, requiring a clear line to be established between the new construction and the functioning campus.

Accommodating 1,280 students, the design prioritizes innovation and collaboration, with 10,000 square feet of learning commons spaces distributed throughout. A discernible, defined main entrance helps emphasize site and building presence, while a separate entrance allows afterhours access for community events. Improved program spaces include larger science labs and adequate gymnasium and auditorium space. The facility includes teaching spaces for the international baccalaureate magnet school, including classrooms for foreign language and visual arts. In a departure from previous district middle schools, which housed sixth grade in a separate building, the facility also places the youngest students on the third floor with their own, dedicated stairwell. This allows a degree of insulation for younger students while bringing the entire student body together in one structure.

The site also includes a bus transportation center with staff offices, a maintenance cluster with storage and workrooms, and parking spaces for 60 buses.

Architect

The S/L/A/M Collaborative, Inc.

80 Glastonbury Blvd.
Glastonbury, CT 06033
SLAMColl.com
Mark Rhoades, AIA, Principal/Design Architect
860-368-4258

Design Team

  • Catherine J Ellithorpe, Principal-in-Charge
  • Mark Rhoades, Design Principal
  • Amanda Hastings Shea, Interior Designer
  • Kristen Furtak, Programming & Planning

Owner/Client

Henry J Winters Elementary School
Pawtucket, RI
Maria SanMartino-Clinton, Principal

Key Stats

  • Grades Served: PreK–5
  • Capacity of Students/Occupants: 643
  • Size of Site: 2.6 acres
  • Gross Area of Bldg./Space: 94,000 gsf
  • Space per Student: 146 sq. ft.
  • Cost per Student: $6,438
  • Square Foot Cost: $440
  • Project Cost: $41,400,000
  • Occupation Date: 9/1/2022
  • Sustainability Rating Status: NE-CHPS

Award Issue

Spring 2024
— Citation of Excellence

Photography

@2023 Andy Ryan Photographer LLC

Related Projects

2026 Outstanding Project

Outstanding Project

Torrington Middle / High School and Central Administration Offices

The S/L/A/M Collaborative, Inc.