Racine, WI

Jerstad-Agerholm K–8 School

Combined-Level School

New Construction

Entire Building

2026 Outstanding Project

Welcoming students to the revitalized 1,590-seat Jerstad-Agerholm K–8 School marks the culmination of eight years of planning, two years of phased construction, and strategic grade reconfiguration to meet the needs of a growing student body. Originally built in 1952, the school has seen many additions, but none as transformational as this reimagining—honoring its legacy while preparing it for decades of future learning.

The “like-new” facility now serves 4K through 8th grade with balanced enrollment, improved site circulation, full ADA compliance, and redesigned outdoor areas featuring grade-level play structures and a secure bus drop-off.

New construction adds vital spaces, including a full-size gym, multi-purpose commons with warming kitchen, and dedicated art, music, and band rooms. Renovated areas introduce expanded classrooms, a vibrant library, and an innovative Maker Space encouraging creativity and exploration. Specialized intervention, sensory, and therapy rooms now support diverse student needs.

Middle school renovations enhance hands-on learning with new foods, fabrication, and art labs, a production kitchen, and flexible collaboration areas.

Beyond academics, Jerstad-Agerholm stands as a community anchor with year-round spaces for engagement and on-site mental health support—reflecting the values of courage, integrity, and service exemplified by its namesakes, Mr. Jerstad and Mr. Agerholm, both Medal of Honor recipients.

Architect

Plunkett Raysich Architects, LLP

209 S Water St.
Milwaukee, WI 53204
prarch.com
Nicholas Kent, AIA, NCARB, LEED AP, ALEP, Partner
414-410-2968

Design Team

  • Devin Kack, Partner, Designer
  • Doug Kunde, Project Manager
  • Paige Steed, Project Architect
  • Megan Ziesemer, Interior Designer

Owner/Client

Racine Unified School District
Racine, WI
James Hooper, Director of Facility Planning

Key Stats

  • Grades Served: K–8
  • Capacity of Students/Occupants: 1,590
  • Gross Area of Bldg./Space: 194,850 gsf
  • Space per Student: 122 sq. ft.
  • Cost per Student: $32,767
  • Square Foot Cost: $267
  • Project Cost: $52,100,000
  • Occupation Date: 8/27/2024

Award Issue

Spring 2026
— Outstanding Project

Photography

©2025 Tricia Shay Photography

Related Projects

2026 Outstanding Project

Outstanding Project

Laconia Middle / High School

Plunkett Raysich Architects, LLP
2024 Outstanding Project

Outstanding Project

Reedsville Elementary School

Plunkett Raysich Architects, LLP