San Diego, CA

Logan Memorial Educational Campus

Combined-Level School

New Construction

Entire Building

2024 Grand Prize - Over 100,000 sq ft

The existing Logan Elementary and Memorial Middle School was rumored to be closing. The first master plan meeting opened with protest signs and news crews. Although the school historically underperformed academically, community members had instilled a sense of pride in their school and wanted to preserve its rich culture. They recognized the need for updated facilities and a new approach to instruction to close the achievement gap. With an open and transparent process, the resulting master plan retains the TK–8 component and transforms the site into a single comprehensive TK–12 campus. It also houses the first high school in Logan Heights’ history, making it a true neighborhood school.

Logan Memorial is a walkable neighborhood learning center with student-focused environments that support hands-on activities, teamwork, critical-thinking, and problem-solving skills for learners of all ages. Scattered across campus are maker spaces and design labs with 3D printers, laser cutters, and equipment to prototype and create manufactured work. At the TK–8 Montessori school, students learn and explore at their own pace to become critical thinkers. The new 9-12 school features career pathways in health sciences and design engineering which come together at the center of the building in a large, tiered collaboration space.

Architect

DLR Group

731 Ninth Ave., Ste. A
San Diego, CA 92101
dlrgroup.com
Buddy Gessel, AIA, LEED AP, Architect
619-795-2450

Design Team

  • Balfour Beatty Construction, General Contractor

Owner/Client

San Diego Unified School District
San Diego, CA
Dr. Lamont Jackson, Superintendent

Key Stats

  • Grades Served: TK–12
  • Capacity of Students/Occupants: 2,060
  • Size of Site: 19.8 acres
  • Gross Area of Bldg./Space: 241,100 gsf
  • Space per Student: 126 sq. ft.
  • Cost per Student: $88,350
  • Square Foot Cost: $754
  • Project Cost: $182,000,000
  • Occupation Date: 12/1/2022
  • Sustainability Rating Status: CHPS

Award Issue

Spring 2024
— Grand Prize

Photography

@Zack Benson; @Costea Photography

Related Projects

2026 Citation of Excellence Award

Citation of Excellence Award

Kalamazoo Regional Educational Service Agency Career Connect Campus

DLR Group
2026 Grand Prize

Grand Prize

Del Mar Heights School

DLR Group
2025 Outstanding Project

Outstanding Project

Gretna East High School

DLR Group
2025 Outstanding Project

Outstanding Project

Tomball Early Excellence Academy

DLR Group
2024 Outstanding Project

Outstanding Project

Boys Town Education Center

DLR Group