Colchester, IL

West Prairie Jr./Sr. High School

Combined-Level School

Renovation/Addition

Entire Building

2026 Outstanding Project

This post was originally published on this site.

Riding the Winds of Change

Like the Cyclones that symbolize its spirit, West Prairie Community Unit School District #103 has always embraced resilience and progress. When its nearly 50-year-old middle school no longer supported modern education, the district partnered with Graham & Hyde Architects to transform the aging facility into a vibrant learning environment.

Rather than replace the building, the design preserved its structural framework while reimagining nearly every space. Three additions totaling 8,500 sq. ft. introduced a secure administration entrance, a new cafeteria and commercial kitchen, and classrooms connected to a covered outdoor learning area. Inside, flexible learning spaces, durable finishes, and improved accessibility support today’s instructional needs.

Comprehensive infrastructure upgrades included a new HVAC system, insulated exterior walls, high-performance windows, LED lighting, modern technology, and complete life safety and security systems. By retaining much of the original structure, the project reduced construction waste while improving energy efficiency and long-term sustainability.

Today, the renovated 41,000 sq. ft.,       Jr./Sr. High School provides spaces that foster collaboration, innovation, and student well-being. More than a renovation, the project reflects responsible stewardship, community partnership, and a renewed investment in rural education, creating a facility that will serve future generations with the same resilience and forward momentum embodied by the Cyclones.

Architect

Graham & Hyde Architects, Inc.

1010 Clocktower Dr.
Springfield, IL 62704
GrahamandHyde.com
David R. Leggans, AIA, NCARB, LEED AP
217 - 787-9380

Design Team

  • David R. Leggans, Principal Architect
  • Benton & Associates, Civil Engineering
  • KED Bluestone, Plumbing, Mechanical, Electrical Engineering
  • Kuhn & Trello Consulting Engineers, LLC, Structural Engineering

Owner/Client

West Prairie CUSD #103
Colchester, IL
Curt Rheingans, Superintendent

Key Stats

  • Grades Served: 7–12
  • Capacity of Students/Occupants: 300
  • Gross Area of Bldg./Space: 41,000 gsf
  • Space per Student: 137 sq. ft.
  • Project Cost: $10,000,000
  • Occupation Date: 8/16/2023

Award Issue

Fall 2026
— Outstanding Project

Photography

©John Muchow Photography

Related Projects

2026 Outstanding Project

Outstanding Project

Washington Elementary School, Jacksonville SD #117

Graham & Hyde Architects, Inc.