Forney, TX

O.B. Johnson Elementary School

Early Childhood School / Elementary School

New Construction

Entire Building

2024 Outstanding Project

Johnson Elementary School is Forney ISD’s 10th elementary school campus. Utilizing a highly successful prototype, the design reinforces the district’s vision of flexible, efficient and innovative learning environments. The exterior maintains a traditional aesthetic and complements the surrounding residential community.

Inside, “The Hub”, or learning commons for the school, is a space that is scaled across all district campuses to create multi-purpose, dynamic learning environments for students. The commons features flex labs, a maker space, flexible furniture, areas for collaboration and for quiet reading. The commons expands outdoors, maximizing the site’s square footage for creative learning.

Understanding that student learning thrives in environments that promote autonomy of choice, this design emphasizes student independence. Classroom pods feature a central collaboration space, with brightly colored insets, furniture and acoustical design elements. Hallways are activated with reading coves, benches and writing surfaces to encourage collaboration among peers. These spaces were widened from the original prototype to support multiple furniture layouts for students to manage as needed. Expansive windows usher natural light through to the interior collaboration spaces and allow for easy teacher supervision.

The second level houses an outdoor patio to promote outdoor learning activities and offer more connection to natural surroundings.

Architect

Huckabee

Granite Park Bldg. 5
5830 Granite Pkwy, Ste. 750
Plano, TX 75024
huckabee-inc.com
Kate Dunfee, AIA, RID, Principal
972-292-7670

Design Team

  • Gallagher Construction Services, Construction Manager
  • Romine, Romine & Burgess, MEP Engineer
  • Huckabee, Structural Engineer
  • RLK Engineering, Civil Engineer

Owner/Client

Forney ISD
Forney, TX
Dr. Justin Terry, Superintendent

Key Stats

  • Grades Served: K–4
  • Capacity of Students/Occupants: 900
  • Size of Site: 12 acres
  • Gross Area of Bldg./Space: 106,366 gsf
  • Space per Student: 118 sq. ft.
  • Cost per Student: $36,789
  • Square Foot Cost: $311
  • Project Cost: $33,110,257
  • Occupation Date: 7/11/2022

Award Issue

Spring 2024
— Outstanding Project

Photography

@Grant Van Hoose, Huckabee

Related Projects

2026 Outstanding Project

Outstanding Project

Georgetown ISD Future Ready Learning Complex

Huckabee, a MOREgroup brand
2025 Outstanding Project

Outstanding Project

Keith Bell Opportunity Central

Huckabee
2025 Outstanding Project

Outstanding Project

Santa Maria High School

Huckabee
2024 Outstanding Project

Outstanding Project

Walnut Grove High School

Huckabee
2024 Outstanding Project

Outstanding Project

Artesia High School

Huckabee