Prosper, TX

Walnut Grove High School

High School

New Construction

Entire Building

2024 Outstanding Project

This post was originally published on this site.

Walnut Grove High School unifies two themes: community tradition and 21st century learning. The campus building blends classical and modern design, uniting the themes as a reflection of the community’s goals for education.

The main building is anchored by three monumental elements that host timeless pedagogies—an auditorium for performance, an arena for athletic competition, and a forum where students, educators, and the community gather and learn within interior and exterior spaces. These components are expressed with a classical vocabulary that embodies symbols of learning. The main street corridor is the modern thoroughfare that connects the auditorium, arena, and forum to their counterparts in contemporary curriculum. Collaboration spaces, strategically placed along the main thoroughfare, foster interaction and teamwork essential for 21st-century learning. Flexible layouts and furniture adapt to various activities, encouraging spontaneous collaboration and dynamic educational experiences.

STEAM and CTE instructional spaces support advanced learning and technology; they are designed for innovation, opportunity, and real-world experience. CTE programs include both traditional programs and future-forward opportunities such as media and broadcast, e-sports, vet tech, gaming design, and fashion design.

Architect

Huckabee

801 Cherry St., Ste. 500
Fort Worth, TX 76102
huckabee-inc.com
Devin Wilson, Senior Executive Director, Education
817-377-2969

Design Team

  • Romine, Romine, and Burgess, MEP
  • Teague Nall and Perkins, Civil Engineering
  • IEG Innovative Engineering Group, Structural Engineering
  • Pogue Construction, Contractor

Owner/Client

Prosper ISD
Prosper, TX
Dr. Holly Ferguson, Superintendent

Key Stats

  • Grades Served: 9–12
  • Capacity of Students/Occupants: 3,000
  • Size of Site: 82 acres
  • Gross Area of Bldg./Space: 621,434 gsf
  • Project Cost: $192,435,903
  • Occupation Date: 8/7/2023

Award Issue

Fall 2024
— Outstanding Project

Photography

©Huckabee

Related Projects

2026 Outstanding Project

Outstanding Project

Georgetown ISD Future Ready Learning Complex

Huckabee, a MOREgroup brand
2025 Outstanding Project

Outstanding Project

Keith Bell Opportunity Central

Huckabee
2025 Outstanding Project

Outstanding Project

Santa Maria High School

Huckabee
2024 Outstanding Project

Outstanding Project

Artesia High School

Huckabee
2024 Outstanding Project

Outstanding Project

O.B. Johnson Elementary School

Huckabee