• Spring 2027 CFE
  • Acoustic Solution

Waco, TX

Waco High School

High School

New Construction

Entire Building

2026 Outstanding Project

This post was originally published on this site.

Waco High School represents a transformational investment in the future, creating a next-generation learning environment that honors generations of tradition while preparing students for the opportunities ahead. The 350,000 sq. ft. campus serves 2,150 students and unites the identities of three historic Waco high schools into one shared vision.

Through an extensive community-driven design process, district leaders, educators, students, alumni, and a Historical Advisory Committee helped shape a campus that celebrates the stories, traditions, and people who have defined Waco HS. These legacies are thoughtfully integrated through murals, graphics, wayfinding, and architectural elements that create a sense of belonging and connection.

Designed to support project-based learning, career and technical education, collaboration, and flexible instructional models, the campus provides learning environments that extend beyond the traditional classroom. Academic neighborhoods, shared learning spaces, and adaptable classrooms encourage engagement, creativity, and collaboration while supporting evolving educational needs.

Every element reflects a commitment to student success, community pride, and the future of education. From preserving the original gym floor as a signature design element to creating spaces that foster exploration, connection, and discovery, Waco High School demonstrates how thoughtful design can preserve a community’s history while inspiring generations of students to come.

Architect

O’Connell Robertson

811 Barton Springs Rd., Ste. 900
Austin, TX 78704
oconnellrobertson.com
Andrew Faust, Project Manager
512-478-7286

Design Team

  • Andrew Faust, Project Manager
  • Patricia Runge, Interior Designer
  • Pooja Harris, Project Architect
  • Grace Ito, Project Engineer

Owner/Client

Waco Independent School District
Waco, TX
Dr. Tiffany Spicer, Superintendent

Key Stats

  • Grades Served: 9–12
  • Capacity of Students/Occupants: 2,150
  • Gross Area of Bldg./Space: 351,069 gsf
  • Project Cost: $147,000,000
  • Occupation Date: 8/1/2025

Award Issue

Fall 2026

Outstanding Projects

Photography

©2026 Wade Griffith

Related Projects

2026 Outstanding Projects

Outstanding Projects

Kendrick Elementary School

O’Connell Robertson
2025 Outstanding Projects

Outstanding Projects

Tennyson Middle School

O’Connell Robertson
2024 Outstanding Projects

Outstanding Projects

Comal ISD: Farias Spitzer and Comal Creek Elementary Schools

O’Connell Robertson