Waco, TX

Tennyson Middle School

Middle School/Intermediate School

New Construction

Entire Building

2025 Outstanding Project

The new Tennyson Middle School, situated on a 16-acre site in Waco, Texas, replaces the existing facility while allowing for its continued operation throughout construction. The 183,000 SF school welcomed students in August 2024. The design reflects a collaborative effort between school staff, Waco ISD, and the design team to meet the district’s 21st-century educational goals while adapting to the unique context of the Tennyson site.

The design embodies the school’s “True Grit” motto, with resilient materials symbolizing strength and adaptability. Sustainability efforts included the use of local materials, energy-efficient systems, and passive design strategies for natural ventilation and daylighting.

A defining feature of the new school is the incorporation of a scale model of the Brazos River, which symbolizes the learning journey of students. This design element reflects the fluidity and growth of education, serving as a physical representation of the students’ development and perseverance through challenges.

The school includes flexible academic spaces, such as grade-level neighborhoods and collaborative work areas, as well as specialized facilities for athletics, performing and fine arts, and a new eight-lane track and field for district events. A centralized library and dining commons with outdoor access enhance the learning experience.

Architect

O’Connell Robertson

811 Barton Springs Rd., Ste. 900
Austin, TX 78704
oconnellrobertson.com
Jarrod Sterzinger, AIA, LEED AP, Principal, Director of Architecture
512-478-7286

Design Team

  • Jarrod Sterzinger, AIA, LEED AP, Principal-In-Charge
  • Pooja Harris, Assoc. AIA, NOMA, Architectural Designer
  • Patricia Runge, RID, NCIDQ, Interior Designer
  • Travis Lowe, Construction Administration

Owner/Client

Waco Independent School District
Waco, TX
Dr. Susan Kincannon, Superintendent

Key Stats

  • Capacity of Students/Occupants: 1,050
  • Size of Site: 16 acres
  • Gross Area of Bldg./Space: 183,000 gsf
  • Space per Student: 174 sq. ft.
  • Cost per Student: $63,800
  • Square Foot Cost: $366
  • Project Cost: $67,000,000
  • Occupation Date: 8/1/2024

Award Issue

Spring 2025
— Outstanding Project

Photography

©Tom McConnell

Related Projects

2026 Outstanding Project

Outstanding Project

Waco High School

O’Connell Robertson
2026 Outstanding Project

Outstanding Project

Kendrick Elementary School

O’Connell Robertson
2024 Outstanding Project

Outstanding Project

Comal ISD: Farias Spitzer and Comal Creek Elementary Schools

O’Connell Robertson