West Grove, PA

Avon Grove High School

High School

New Construction

Entire Building

2024 Outstanding Project

This project transformed a 153-acre farm into a high school campus with a range of flexible, collaborative spaces interwoven to establish a dynamic platform for learning and development.

The school is organized to achieve the district’s mandate to support robust programs in academics, arts, and athletics. After entering, visitors arrive at a central academic zone surrounded by the media center, student commons with learning stair, and two outfitted exterior courtyards. The “quiet” courtyard hosts instructional activities, outdoor experiments, and artistic endeavors while the “loud” courtyard supports outdoor dining and socialization.

A highlight is the prevalence of spaces to support technical education such as digital arts and graphic design, jewelry design, business, computer science, media, textiles and fashion, culinary arts, and advanced materials. The elevation of arts was another focus with dedicated suites for both performing and visual fields. The indoor/outdoor athletics complex is clustered with a dedicated entry to encourage after-hours and community use.

Located in a growing community with agricultural roots, the aesthetic celebrates this identity via both traditional and contemporary materials such as brick, metal panels, glass, and wood paneling and casework. The school houses 1,750 but is expandable for up to 2,200 using existing common spaces.

Architect

KCBA Architects

8 East Broad Street
Hatfield, PA 19440
kcba-architects.com
Michael Kelly, AIA, ALEP, LEED AP, Principal
215-368-5806

Design Team

  • Michael Kelly, AIA, ALEP, LEED AP, Principal-In-Charge
  • Michael Strohecker, AIA, Design Director
  • Roger McTague, NCIDQ, Project Manager
  • Snyder Hoffman Associates, MEP Engineer

Owner/Client

Avon Grove School District
West Grove, PA
Dr. M. Christopher Marchese, Superintendent

Key Stats

  • Grades Served: 9–12
  • Capacity of Students/Occupants: 1,750
  • Size of Site: 153 acres
  • Gross Area of Bldg./Space: 298,000 gsf
  • Project Cost: $105,000,000
  • Occupation Date: 9/6/2022

Award Issue

Spring 2024
— Outstanding Project

Photography

@Halkin Mason Photography

Related Projects

2026 Outstanding Project

Outstanding Project

New David Center at La Salle College High School

KCBA Architects
2025 Outstanding Project

Outstanding Project

Arrowhead Elementary School

KCBA Architects
2025 Outstanding Project

Outstanding Project

Lower Moreland High School

KCBA Architects