Huntingdon Valley, PA

Lower Moreland High School

High School

New Construction

Entire Building

2025 Outstanding Project

The centerpiece of a reimagined secondary campus, this new high school navigated several site challenges including a significant 36′ grade change. The design concept capitalized on this condition with a vertically compact, four-level building plan that enabled multiple organizational efficiencies and innovations.

The main entrance on the third floor leads to the uppermost tier of a dynamic educational forum and engagement platform. Stepping down three levels, this core element steers students through an open media center and learning stair, STEM and fabrication labs, a hardscaped exterior courtyard, and varied collaboration areas. At the base of this feature, common spaces including the competition gym and open lobby/cafeteria supporting full-day instruction are arrayed to serve students and the community.

Other programmatic highlights include a state-of-the-art performing arts suite anchored by a black-box style theater with semi-flexible seating and full audio/video controls as well as customized spaces for technology education such as STEM and fabrication labs, ceramics workshop, digital arts studio, audio/video suite, and maker space.

The building projects a contemporary aesthetic that cascades down the slope with select focal areas of vertical glazed bands strengthening the architectural presence.

Architect

KCBA Architects

8 East Broad St.
Hatfield, PA 19440
kcba-architects.com
Michael Kelly, AIA, ALEP, LEED AP, Principal
215-368-5806

Design Team

  • Michael Kelly, AIA, ALEP, LEED AP, Principal-In-Charge
  • Michael Strohecker, AIA, Design Director
  • Miranda Esposito, Design Professional
  • Consolidated Engineers, MEP Engineer

Owner/Client

Lower Moreland Township School District
Huntingdon Valley, PA
Mark McGuinn, Business Manager

Key Stats

  • Grades Served: 9–12
  • Capacity of Students/Occupants: 1,000
  • Size of Site: 57 acres
  • Gross Area of Bldg./Space: 187,000 gsf
  • Project Cost: $69,900,000
  • Occupation Date: 8/28/2023

Award Issue

Spring 2025
— Outstanding Project

Photography

©Halkin Mason Photography

Related Projects

2026 Outstanding Project

Outstanding Project

New David Center at La Salle College High School

KCBA Architects
2025 Outstanding Project

Outstanding Project

Arrowhead Elementary School

KCBA Architects
2024 Outstanding Project

Outstanding Project

Avon Grove High School

KCBA Architects