Sausalito, CA

Dr. Martin Luther King Jr. Academy Campus

Early Childhood School / Elementary School

New Construction

2026 Outstanding Project

This post was originally published on this site.

When the Sausalito-Marin City School District envisioned a new elementary school, the goal was larger than square footage and site plans — it was about belonging. The new Martin Luther King Jr. Academy represents a deliberate step toward unifying two richly diverse communities, Sausalito and Marin City, under a shared commitment to equitable education.

Every corner of the campus reflects that intention. Designed around the concept of the Whole Learner, the school treats health, well-being, and academic success not as separate pursuits but as deeply connected ones. Inspiring indoor-outdoor environments blur the line between classroom and courtyard, while dedicated “learning play zones” invite the kind of spontaneous collaboration and social exchange that no textbook can manufacture.

The physical program brings together a 12-classroom instructional building, a 10,750 sq. ft. multi-use facility including a kitchen, stage, and support spaces, along with dedicated administration and library buildings. A STEAM lab and extensive outdoor learning areas round out a campus built for hands-on, inquiry-driven education.

The project was shaped by a deeply collaborative, ongoing dialogue with students, families, and stakeholders who brought their own knowledge of what these children need to thrive. The result is a school that doesn’t just serve its community. It reflects it.

Architect

JKAE

300 Orchard City Dr., Ste. 140
Campbell, CA 95008
jkaedesign.com
Chris Vicencio, AIA, NCARB, LEED AP, DBIA, Partner
530-888-0998

Design Team

  • Adrian Watson, Andrew Seymour, Andrew Todd, Daniel Hill, Greg Hong, Janelle Totari, Josh Paradis, Kevin Marer,
  • Manuel Ordonez, Mike Zandi, Sepideh Amin,
  • Serina Martineau, Sherry Sajadpour

Owner/Client

Sausalito Marin City School District
Marin City, CA
LaResha Huffman, Superintendent

Key Stats

  • Grades Served: TK–8
  • Capacity of Students/Occupants: 282
  • Size of Site: 17 acres
  • Gross Area of Bldg./Space: 44,926 gsf
  • Space per Student: 159 sq. ft.
  • Cost per Student: $117,021
  • Square Foot Cost: $735
  • Project Cost: $33,000,000
  • Occupation Date: 8/1/2025
  • Sustainability Rating Status: CalGreen

Award Issue

Fall 2026
— Outstanding Project

Photography

© Chris Beck Photography

Related Projects

2026 Outstanding Project

Outstanding Project

Butte College Science & Planetarium Complex

JKAE
2024 Outstanding Project

Outstanding Project

Evergreen Valley College Language Arts Classroom & Lab

JKAE