Pearland, TX

George A. Thompson Intermediate School

Middle School/Intermediate School

New Construction

Entire Building

2024 Outstanding Project

When George A. Thompson Intermediate School suffered significant damage from Hurricane Harvey, Pasadena ISD set out to build a new, larger intermediate school for 1,200 students, grades 7–8.

Thompson Intermediate has a tradition of excellence in academics, athletics, and student leadership. The exterior mixes traditional and modern elements giving the campus a clean, timeless appearance. Warm interior colors and textures reaffirm the school’s legacy and pride. A beloved graphic from the original school was recreated in the cafeteria. The center of the original gym floor was re-installed as a wall graphic. Inspirational quotations complement the weight room and library.

At the heart of the school is a large, multifunctional area that serves as the cafeteria and venue for performances and gatherings. This space is distinguished by a curved learning stair providing additional seating and encouraging social connection. At the top of the stair, the library offers study areas, a makerspace, and abundant outdoor views.

Supporting the district’s 21st-century learning initiatives, future-ready classrooms utilize a technology-engaged learning model. Science classrooms and labs are connected by garage doors to facilitate team teaching and group learning models. Flex areas and outdoor learning allow for growing minds to engage in a variety of settings.

Architect

GPD Group

2121 Sage Rd., #240
Houston, TX 77056
gpdgroup.com
Lisa Michela, AIA, LEED GA, Director – Education, TX
713-622-1448

Design Team

  • GPD Group, Architecture & Interior Design
  • LTY Engineers, PLLC, MEP Engineering
  • S&G Engineering Consultants, LLC, Civil Engineering
  • Drymalla Construction Company, General Contractor

Owner/Client

Pasadena Independent School District
Pasadena, TX
Kevin Fornof, Assoc. Supt. Facilities & Construction

Key Stats

  • Grades Served: 7–8
  • Capacity of Students/Occupants: 1,200
  • Size of Site: 21 acres
  • Gross Area of Bldg./Space: 181,676 gsf
  • Space per Student: 151 sq. ft.
  • Cost per Student: $33,822
  • Square Foot Cost: $223
  • Project Cost: $40,586,347
  • Occupation Date: 7/29/2023

Award Issue

Spring 2024
— Outstanding Project

Photography

@2023 Photoarchitectural, LLC

Related Projects

2026 Outstanding Project

Outstanding Project

Triway PK-12 School

GPD Group
2025 Outstanding Project

Outstanding Project

Cloverleaf Middle/High School

GPD Group