Spokane, WA

Peperzak Middle School

Middle School/Intermediate School

New Construction

Entire Building

2025 Grand Prize Over 100,000 Sq Ft

This dynamic middle school reflects exceptional circumstances coming together to create a vibrant and welcoming learning environment. The design embodies the guiding principles to build a community of belonging and supporting ‘learning happening everywhere’ leveraging the benefits of its setting for views, daylight, and outdoor learning opportunities.

Carla Olman Peperzak, a local 100-year-old Holocaust survivor and educator, was chosen as the school’s namesake, for her contributions to the regional educational community. Her engagement with students enriches their educational experience, fostering a sense of history, empathy, and understanding.

The building’s form and finishes take inspiration from its agricultural context. Without copying barns and silos, the building’s ordered/disordered window openings and exposed steel structure presents a similar hard-working aesthetic. The design directs attention to views of courtyards, fields, and learning spaces maximizing outdoor connections and daylight in every aspect of the learning and common spaces. An innovative learning space arrangement ensures equity of experience, where classroom neighborhoods connect to a two-story ‘heart of the school’ commons area.

A social stair for gathering centered between the Learning Commons (library) and Nutritional Commons (cafeteria) features opportunities for ‘learning happening everywhere’ including areas carved out in spaces typically intended for transitional uses.

Peperzak Middle School offers opportunities for learning both inside and out, in a welcoming and inclusive environment that celebrates its site and context.

Architect

Integrus

10 South Cedar
Spokane, WA 99201
integrusarch.com
Becky Barnhart, AIA, NCARB, LEED AP, Principal
505-838-8681

Design Team

  • Integrus, Architect, Structural Engineer & Interior Design
  • MW Consulting Engineers, Mechanical & Electrical
  • AHBL, Civil
  • SPVV, Landscape Architect

Owner/Client

Spokane Public Schools
Spokane, WA
Greg Forsyth, Director, Capital Project & Planning

Key Stats

  • Grades Served: 6–8
  • Capacity of Students/Occupants: 850
  • Size of Site: 20 acres
  • Gross Area of Bldg./Space: 128,000 gsf
  • Space per Student: 150 sq. ft.
  • Cost per Student: $69,748
  • Square Foot Cost: $328
  • Project Cost: $59,286,000
  • Occupation Date: 8/1/2023
  • PHOTOGRAPHY: ©Lara Swimmer Pho

Award Issue

Spring 2025
— Grand Prize

Photography

©Lara Swimmer Photography

Related Projects

2026 Immersive

Immersive

Johnson Science Building

Integrus
2026 Outstanding Project

Outstanding Project

Mariner High School Addition

Integrus
2025 Outstanding Project

Outstanding Project

Mish ee twie

Integrus
2024 Grand Prize

Grand Prize

Salish Coast Elementary School

Integrus
2024 Citation of Excellence Award

Citation of Excellence Award

The Hive

Integrus