Hammond, WI

St. Croix Central High School

High School

Renovation/Addition

Entire Building

2025 Outstanding Project

This post was originally published on this site.

Over the past 15 years, St. Croix Central School District has strategically expanded its facilities to meet growing enrollment and the rising demand for career and technical education (CTE). Partnering with Wold Architects and Engineers, the District embraced a master planning approach that began in 2014 with new classrooms, a gymnasium, and an auditorium.

The latest phase includes a cutting-edge manufacturing and technical education center, designed to provide hands-on, real-world learning experiences. Purpose-built instructional spaces support programs in precision manufacturing, woodworking, culinary arts, agricultural science, and computer science. These are paired with flexible collaboration zones equipped for interdisciplinary learning.

The design supports tangible student outcomes, including industry certifications. Notably, students can earn a 14-credit Mechatronics diploma covering mechanics, robotics, computing, and more—skills highly sought after by regional employers.

Community input, gathered through a bond referendum and engagement process, shaped the broader plan. This included HVAC upgrades, a new track and field, virtual academy enhancements, and safer parking and traffic flow. Through thoughtful planning and community collaboration, St. Croix Central has created a future-ready learning environment that prepares students for evolving careers and lifelong success.

Architect

Wold Architects and Engineers

50 South 6th St., Ste. 2250
Minneapolis, MN 55402
woldae.com
Ben Beery, AIA, Principal
612-772-9025

Design Team

  • Ben Beery, Principal, AIA
  • Maria Kennedy, Project Manager
  • Conrad Hively, Project Designer
  • Jason Plante, Market & Johnson, Vice President

Owner/Client

St. Croix Central School District
Hammond, WI
Tim Widiker, Superintendent

Key Stats

  • Grades Served: 9–12
  • Capacity of Students/Occupants: 600
  • Size of Site: 75 acres
  • Gross Area of Bldg./Space: 168,500 gsf
  • Space per Student: 281 sq. ft.
  • Cost per Student: $41,667
  • Square Foot Cost: $148
  • Project Cost: $25,000,000
  • Occupation Date: 9/3/2024

Award Issue

Fall 2025
— Outstanding Project

Photography

©Troy Thies Photography

Related Projects

2026 Outstanding Project

Outstanding Project

Plum Grove Middle School

Wold Architects and Engineers
2025 Outstanding Project

Outstanding Project

White Bear Lake High School

Wold Architects and Engineers
2024 Outstanding Project

Outstanding Project

Owatonna High School

Wold Architects and Engineers