Orlando, FL

Porter Family Center for Innovation & Academics at Lake Highland Preparatory School

High School

New Construction

Entire Building

2024 Outstanding Project

This post was originally published on this site.

The Porter Family Center exemplifies a commitment to providing an elevated educational experience. Guided by the 2018 Strategic Plan, stakeholders, including parents, faculty, staff, trustees, alumni, and students, collaboratively shaped a trajectory to enhance learning environments, pedagogy, and innovation.

The new facility, replacing two existing structures, was designed to maintain academic operational continuity during construction. Critical infrastructural upgrades integrated power, communication, IT, and security services into the new facility before demolishing the old buildings.

Strategically placed, the new building promotes transparency and connection within the local ecology. The south emanates a welcoming warmth as a new front door, while the north prioritizes transparency, bathing classrooms in natural light, showcasing Lake Highland’s scenic views.

Complemented by versatile learning studios, robotics center, maker spaces, and collaborative areas, the Innovation Hub fosters collective engagement. Flexibility and adaptability are central to the design with STC-rated operable partitions reshaping spaces as needs evolve.

A social stair connects the library to a floating platform for teamwork and circulation, complemented by vibrant graphics highlighting school history. Modular furniture ensures variety and accessibility, while interconnected classrooms and flex-spaces embrace fluid learning experiences. Geometric ceiling baffles and lighting accents enhance common areas with biophilic elements woven throughout.

Architect

Schenkel Shultz

834 N.Orange Ave.
Winter Park, FL 32789
schenkelshultz.com
Ekta Desai, AIA, Design Lead
407-872-3322

Design Team

  • Ekta P. Desai, AIA, Design Lead, Partner   
  • David Torbert, AIA, Partner
  • Kasey Teimouri, AIA, Principal
  • Scott Skidelsky, Balfour Beatty, General Contractor

Owner/Client

Lake Highland Preparatory School Porter Family Center for Innovation & Academics
Orlando, FL
James A. McIntyre, President

Key Stats

  • Grades Served: High School
  • Capacity of Students/Occupants: 594
  • Size of Site: 22.53 acres
  • Gross Area of Bldg./Space: 71,000 gsf
  • Space per Student: 120 sq. ft.
  • Cost per Student: $48,822
  • Square Foot Cost: $408
  • Project Cost: $29,000,000
  • Occupation Date: 8/10/2023

Award Issue

Fall 2024
— Outstanding Project

Photography

@Andres Marin Photography

Related Projects

2026 Honor Award

Honor Award

Booker High School Visual Performing Arts Theatre Renovation

Schenkel Shultz
2025 Outstanding Project

Outstanding Project

The Villages Charter High School

Schenkel Shultz
2024 Outstanding Project

Outstanding Project

Porter-Leath Early Childhood Academy | Frayser

Schenkel Shultz
2024 Outstanding Project

Outstanding Project

Trevecca Nazarene University – University Commons

Schenkel Shultz